Professional solutions for compaction technology and asphalt construction.ASPHALT PRO
Please enable the use of cookies to view this content
The ASPHALT PRO software solution enables site managers to significantly simplify the planning of an upcoming road construction project, monitor the ongoing paving process in real time and, if necessary, quickly take corrective action.
What ASPHALT PRO can do:
ASPHALT PRO enables even better paving quality in road construction, fulfilling the requirements of QSBW 4.0 and QAA 4.0.
All survey information can be entered effortlessly by importing Excel data or by manual input. ASPHALT PRO automatically calculates the total mix requirement and generates an efficient paving and logistics concept.
ASPHALT PRO software considerably simplifies the planning process. Even inexperienced site managers can handle the paving planning with just a few clicks.
Proactively following the mix plan and adapting automatically as the project progresses: ASPHALT PRO communicates the current requirements in real time.
Should paving be delayed or material be missing: the mixing plant supervisor always knows the exact amount to be mixed - neither too much nor too little.
And, of course, the site manager is also informed if production at the mixing plant encounters any delays.
ASPHALT PRO adjusts the timing of material deliveries automatically and continuously, taking into account the remaining mix requirement and the actual turnaround times.
Truck drivers can view the route on the app and receive other important information: when loading and unloading should take place. At the same time, those responsible at the construction site know the timing of the next material delivery.
Unplanned paver stops due to a lack of mix can be practically ruled out. In the event of schedule changes or disruptions, all parties involved are informed via the messaging function.
ASPHALT PRO keeps the coordination effort to a minimum. The result: far less stress and maximum quality thanks to constant paving speed.
Efficient and consistent advance planning minimises the number of paving stops. What’s more: the higher paving quality means less reworking – and lower costs.
Any deviations from the original paving plan become immediately apparent through interactive analysis. ASPHALT PRO highlights optimisation potential for the following day.
With ASPHALT PRO, the relevant BOMAP projects can already be created and linked to the respective installation days during the project planning phase. The compaction results documented by BOMAP are available in ASPHALT PRO for further analysis and reporting.
On the construction site, both the result and quality must be right. Time and costs are equally important. ASPHALT PRO makes it very easy to link all process-relevant data and network all those involved in the paving process and planning. ASPHALT PRO works with any make and, of course, with BOMAG feeders, pavers and rollers for asphalt road construction. That's how digitisation in road construction works today.
And with ASPHALT PRO, the site manager maintains a clear overview even in multi-project management. Parallel construction sites can be synchronised, and the required resources perfectly coordinated.
The ASPHALT SITE software version is also perfectly tailored to the everyday challenges of quality road construction. Because the following also applies to smaller construction sites: continuous asphalt paving without interruptions is the key to best results and greater profitability.
Every job is different: Even for experienced users, every construction site poses a new challenge. Our experts are happy to advise you on the right machine and the optimum technology so that your project comes to a successful conclusion. Arrange for a consultation now.